Most public chargers connect to the grid to provide reliable service. Off-grid systems require significant on-site generation/storage, raising CAPEX. Hybrid designs use the grid plus batteries for peak shaving and limited backup. Interconnection studies are essential because feeder/transformer limits drive schedule and cost.
